Installation of Lighting and Earthing Protection at DMS Plant — Sable Zinc Kabwe

Completed

Project Overview

CPS Engineering Enterprise Limited carried out the installation of a comprehensive lighting and earthing protection system at the Dense Media Separation (DMS) plant for Sable Zinc Kabwe Limited. The scope of work included the design, supply, and installation of lightning protection rods, earthing conductors, and bonding systems to protect the plant's electrical infrastructure and personnel from lightning strikes and fault currents. All work was carried out in accordance with IEC 62305 and relevant Zambian electrical standards.

Project Gallery

Sable Zinc Kabwe — earthing protection installation
Sable Zinc Kabwe — DMS plant electrical works
Sable Zinc Kabwe — lightning protection system
Sable Zinc Kabwe — earthing conductor installation
Sable Zinc Kabwe — bonding and earthing works
Sable Zinc Kabwe — plant protection system
Sable Zinc Kabwe — completed earthing installation
Sable Zinc Kabwe — site overview

Ready to Start Your Project?

Get in touch with our engineering team today for expert advice and a competitive quote.

Get a Free Quote WhatsApp Us